Compare STL Roofers · The public record
Your Basement Dehumidifier Runs Through Roof Day: What to Compare
A basement dehumidifier that loses power or overflows on roof day can turn a small leak into a flood. Ask each roofer four things.
A basement dehumidifier is easy to forget on roof day, and it is one of the few appliances in a St. Louis house that can turn a small roof problem into a wet basement. Many homes here run a dehumidifier in a lower level through the summer humidity and the cool clay soil around the foundation. When a roof is torn off, that machine may lose power, sit beside an open ceiling, or fill its bucket faster than anyone checks it. This page covers what to compare across roofers so the machine keeps running and nobody is mopping a basement the day the crew leaves.
Why a dehumidifier belongs on the roof plan
The roof is the first line of protection against water, but the basement is usually where a homeowner finds out a roof was open. A tear-off exposes the deck for hours, and sometimes for a full day. If the weather turns, rain can come through the open deck, run down the rafters, and show up in a ceiling below. Wet drywall and wet carpet are the usual result, and a basement that already runs humid in July will hold that moisture long after the shingles are on.
A dehumidifier pulls moisture out of the air, which helps a basement dry faster after a leak. That only works if the unit stays on, the bucket does not overflow, and the intake is not blocked by tarps, tools or tear-off dust. Each roofer has a different way of routing the crew through the house, and each one should be able to say what happens to a running appliance in a lower level on the day the roof is open.
What tear-off does to the power and the air
Many roof crews run generators, air compressors and nail guns on the lot. Some plug into an exterior outlet, some pull power from the house, and some bring their own. If the crew uses a circuit that also feeds the basement, a breaker trip can switch off the dehumidifier for the whole day without anyone noticing. A machine that sits idle for six or eight hours in a humid lower level can leave the air damp enough to start a musty smell by the next morning.
Tear-off also throws fine dust into the attic and down the stairwells. Dust that settles on a dehumidifier intake or coil reduces how much air the unit can move, and a clogged filter makes the machine work harder while pulling out less water. Ask each roofer whether the crew will keep the lower level closed to dust, and whether someone will check the machine at the end of each workday.
Four things to ask each roofer
Ask each roofer these four questions, and write the answers down beside the bid. The answers should be specific. A general promise to be careful does not tell you what happens to the machine at 3 p.m., when the crew is on the far side of the roof.
- Which circuit will the crew use? Ask whether the crew will plug into an exterior outlet, a garage circuit, or the house panel that feeds the basement. If the answer is the basement circuit, ask who confirms the dehumidifier is running at the end of each day.
- Who empties the bucket or checks the drain line? Many dehumidifiers drain through a hose to a floor drain or sump, and others collect water in a tank. A full tank shuts the unit off. Ask who will check it, and whether the crew will stop long enough to empty it when rain is in the forecast.
- What happens if the power drops? Ask whether the crew will tell you before a breaker trips and who will restart the unit. A machine that comes back on its own after a power cut is a different situation from one that stays off until someone notices.
- How will the intake and filter stay clean? Ask whether the crew will move the unit away from the open stairwell or cover the work area, and whether the filter will be checked once the work is finished.
Where the dehumidifier sits on the day of the work
Before tear-off starts, move the dehumidifier to a spot where the crew does not walk and where attic dust will not fall on it. A clear wall, a clean floor, and a little open space around the intake all help. If the unit has to stay in a room under the work, cover the top with a sheet but keep the intake open. A blocked intake can make the machine overheat, and an overheated machine shuts off.
Walk the lower level with the roofer before the first day. Point out the dehumidifier, the drain route, the outlet it uses, and the breaker in the panel. Ask the roofer to repeat the plan back to you. A short walk like this often exposes a problem the bid never named, such as a drain hose that runs across the path the crew will use to carry materials.
What to put in writing
A verbal plan will not hold if the crew changes or a different supervisor takes over halfway through the job. Put the plan in the work schedule or the job notes. The schedule should name the circuit, the person who checks the machine, the check times, and what the crew does if the power is lost or the bucket fills. If a roofer will not write anything down, that tells you how much attention the house will get on the days when the roof is open.
Keep a note of what you see on the first day. Write the time, what the dehumidifier showed when you checked it, and whether the basement smelled damp. A dated note makes it easier to tell whether a wet spot appeared before the roof was opened, during the work, or after the crew left. It also gives you a clear starting point if you later talk with your insurer, though that conversation is yours to have. Under Missouri law (RSMo 407.725), a roofing contractor is barred from representing or negotiating a homeowner's insurance claim. Keys documents damage, puts a written scope with photos and measurements in your hands, and attends as the contractor while you deal with your own insurer.
Where to start
Start with the circuit question. Ask each roofer which outlet or breaker the crew will use, and whether the dehumidifier shares that circuit. The answer tells you more about the lower level than almost any other line in the bid. Then ask who checks the bucket or drain each day, and ask for that answer in writing. If you want to talk through the plan for your house, call the Keys office at (314) 220-2333 and ask who will be the crew lead on your roof.
Ask us for the document, not for the ranking
A star rating separates the disasters from everyone else and then stops being useful. What separates the rest of the field is the written scope and who is actually standing on the roof, which is what the five criteria at the top of this page are built around.
Keys Roofing works in the same market as every other name on this page, and the fastest way to test our pick is to make us prove it on your own roof. Ask for the scope, lay it beside the two you already have, and hold all three against the same five questions.
Straight through to the Keys Roofing office. If you would rather talk it through than type it out, this is the line.
Ask for the third scope
Roof replacement. St. Louis metro only.
This goes to Keys Roofing and nowhere else. No other company named on this site receives it.