Compare STL RoofersThe sheet, and our picks
Keys Roofing, direct(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure

Compare STL Roofers · The public record

Ask Each Roofer What a Pause Costs Before Materials Are Ordered

Before any shingles are ordered, compare what each roofer's written bid says about pausing, and who pays for the wait.

A roof bid is a price for a start date. Once a supplier has an order in, that price starts costing the roofer money in ways it did not before. Shingles are cut to a color and a bundle count, a deposit may already be on a pallet, and the crew's calendar has a slot with your address on it. So the moment you say "we need to wait" is a moment that roofers handle very differently. This page is about that moment, and about what each written bid says before the order goes out.

Why the pause comes before the order

Most homeowners in the St. Louis area are not thinking about a pause when they sign. They are thinking about the price and the crew's first day. But life gets in the way. A spouse wants another quote, a lender asks for more paperwork, a parent needs a room for the summer, or a permit desk in St. Louis County returns a plan with a question. Any of these can land between signature and the first truck. The question for each roofer is what their paperwork says happens next, before anyone has spent money on materials.

The timing matters because of St. Louis weather. A roof torn off in late October, with a cold snap forecast for the following week, is a different job from the same roof torn off in May. If your pause pushes the start into the freeze-thaw months, some roofers will reprice, some will hold the price and move the date, and some will say nothing until the crew is already booked elsewhere. You want to know which one each roofer does before you need it.

What a pause looks like on paper

A pause is rarely named in a bid. It shows up as a clause about changes, a line about scheduling, a deposit note, or a sentence about materials. Read the cover letter and the terms page side by side. Look for words like "hold," "reschedule," "cancel," "restocking," "deposit," and "materials ordered." If a bid says nothing about any of these, that is an answer too. It means you will be learning the roofer's policy in the middle of your decision.

Pull three things from each bid. First, the date the price is valid through. Second, the event that starts the materials order, such as signature, a deposit clearing, or a permit pull. Third, the sentence that describes what you owe if you ask to stop after that event. These three points are the pause comparison. Everything else in the bid is about the roof itself.

The three costs of waiting

When a pause happens after materials are ordered, the cost usually lands in one of three places. The first is the materials. Shingles that are special ordered, such as a particular Atlas or Malarkey color that is not stocked, may carry a restocking or holding charge if they go back to the supplier. Ask each roofer whether the shingle order is placed at signature or after a deposit clears, and whether returns are accepted and at what charge. Keys installs Atlas and Malarkey shingles, so the question is about how the order is handled, not which brand is in the bid.

The second cost is the crew's time. A roofer who has already booked your address into a particular week may have moved other work to hold it. Ask whether that slot is released on a set day, and whether it is released at all if you ask to move the start by a few weeks. A roofer who says the slot is held until your written decision is giving you a fact you can compare.

The third cost is the deposit. A deposit tied to a materials order is different from one tied to a calendar date. Read the sentence that says when the deposit is earned, and whether any part of it comes back if the job does not start. Compare that sentence across roofers before you compare deposit amounts. A small deposit with a vague earned-date can cost more in practice than a larger one with a clear rule.

What to ask each roofer, in writing

Use the same questions with each roofer, in the same order, and keep the answers. Start with the question of when materials are ordered. Then ask what the order costs you if you pause one week later, three weeks later, and past the first hard freeze. Ask whether a pause changes the price, and if it does, what changes. Ask who sets the new start date, and how many days of notice you get before a slot is reassigned.

Then ask about the paper itself. Ask each roofer to send the pause rule as a short written sentence, not a verbal promise. A reply that says "we work with you" without a date or a dollar figure is not a rule. You are looking for a sentence you could quote back to them. If a roofer will not put it in writing, log that as a gap and weigh it against the others.

Reading the answers side by side

Put the answers in one row per roofer. The columns should be the materials order trigger, the pause cost at one week, the pause cost at three weeks, the slot release rule, the deposit earned-date rule, and whether each answer is in writing. Leave a cell blank if the roofer did not answer. A blank is useful information. It tells you which roofer will be guessing when you need them to be exact.

Do not decide on the lowest pause cost alone. A roofer with a clear, slightly higher pause cost may be a better fit than one who says there is no cost but gives no date for releasing the slot. The point is to know what you are buying. A written rule lets you plan. A vague one leaves you holding the risk.

When the pause is your decision

Sometimes the roofer's rules are fine and the reason for the pause is yours. A household decision, a financing review, or a wait for a dry spell in a wet spring can all be legitimate reasons. The comparison still applies. Tell each roofer the reason in one sentence, and note the reply. If one roofer answers in a way that seems to press you to decide faster, write that down too. A calm, specific answer about the next date is a better sign than a long argument about the price.

If you want to talk through any of these answers with the Keys office, the number is (314) 220-2333. Ask for the pause rule in writing, and ask them to put the materials order date in the same message. That gives you one document to compare against the others, which is the whole point of this page.

From the company at number one

Ask us for the document, not for the ranking

A star rating separates the disasters from everyone else and then stops being useful. What separates the rest of the field is the written scope and who is actually standing on the roof, which is what the five criteria at the top of this page are built around.

Keys Roofing works in the same market as every other name on this page, and the fastest way to test our pick is to make us prove it on your own roof. Ask for the scope, lay it beside the two you already have, and hold all three against the same five questions.

The office line

Straight through to the Keys Roofing office. If you would rather talk it through than type it out, this is the line.

(314) 220-2333

Ask for the third scope

Roof replacement. St. Louis metro only.

This goes to Keys Roofing and nowhere else. No other company named on this site receives it.