Compare STL Roofers · The public record
Ask Each Roofer How Many Roofs Their Estimator Measures in a Week
An estimator who measures many roofs a week may walk yours quickly. Ask each roofer for the weekly count and compare the answers before you compare totals.
Two roofers can quote the same house and both sound careful on the phone, yet one may have sent an estimator who measured nine roofs that week while the other sent someone who measured two. Much of the number on your bid comes from that measuring. The square count, the pitch, the valleys, the penetrations, and the drip edge run all start with someone climbing a ladder or walking your yard with a tape. If that person is stretched thin, the measurement gets rushed, and a rushed measurement tends to show up later as a change order.
Why the measuring count matters
A roof estimate is a set of numbers taken from a surface you cannot see from the street. The estimator counts squares, notes the pitch, marks the chimneys and vents, and sketches each slope. In St. Louis, where many houses carry additions from different decades, one roof can have four or five pitches and two or three valleys that were framed by different hands. Each of those details takes time to measure properly. An estimator who is running from one job to the next may still produce a clean-looking proposal, but the numbers inside it were taken in a hurry.
Freeze and thaw cycles add another reason to care. A roof measured in late October for a spring start will sit through a winter, and any ice damming at the eave that was not noted at measure time tends to surface as a question after the tear-off begins. The estimator who had time to look at the north eave and the shaded valley is the one who wrote it down.
What the number tells you
Asking how many roofs an estimator measures in a week is not a test of character. It is a question about capacity. A roofer can run an estimator across a heavy schedule and still be careful, but you should know which kind of shop you are dealing with before you compare totals. The answer also tells you how much time sits between your visit and your bid. If the estimator measures several roofs a day, your appointment may be a short walk and a photo set. If the estimator measures two or three roofs a week, your visit may include a full walk of every slope.
The number works as a comparison, not a pass or fail. Put the answers from each roofer on one sheet next to the bid date and the length of the visit. A shop that measures fewer roofs per estimator and returns a written scope within a few days has spent its time differently from a shop that measures many and returns the scope on the last day of the window. Neither pattern is automatically wrong, but the two bids should not be scored the same way.
How to ask it
Ask the question in plain words, and ask for a number for the latest full week, not a typical week. A roofer who says about the usual has not answered. Follow up with two more questions. How many of those roofs were measured on site rather than from aerial images? Who checks the figures before the number goes into the bid? Write each answer down with the date you asked.
Ask every roofer the same question in the same words, and record the replies in the same column. If one roofer answers in a sentence and another answers with a number, you still have two answers to compare, but the shorter one is usually the one that needs a second question.
If the estimator also runs jobs, ask that too. An estimator who spends the morning on a tear-off and the afternoon on a measure will usually produce a thinner walk than one who only measures. You are not asking the roofer to promise a specific walk time. You are asking how the working day is divided.
What a useful answer sounds like
- A specific number for the last full week, with the number of site visits behind it.
- A clear statement of whether the measure is done on the roof, in the yard, or from photos and an aerial tool, and which of those the bid relies on.
- A named person who checks the figures before the bid leaves the office.
- A note on whether the person who measured will also be on the crew, or whether the measurement is handed off to someone else.
A vague answer is still information. If the roofer says the estimator is always booked, ask how far out a measure visit is scheduled and whether that lead time moves when the crew is busy. The goal is to learn whether the bid you receive will have had time to be checked before it reaches you.
Using the answers in your comparison
Once you have the count from each roofer, compare it against the bid itself. Look for the places where a rushed measure usually shows: a square count with no breakdown by slope, a missing valley or penetration line, a drip edge total that does not match the eave length, or a ridge line that skips the hips. Ask each roofer to walk you through one of those lines. Their answer will tell you whether the measure was done with care.
You can also ask for the measurement sheet itself, with the slope labels and the photos taken at each slope. A roofer who has measured carefully will have that sheet ready. A roofer who has not may offer a summary instead, and that difference is worth recording next to the count.
Spring thaw can change the picture too. After a wet March, the yard may be too soft for a ladder at the back of the house, so an estimator who measured in dry weather may have walked a different route from the one the crew will use. Ask whether the measure was done on a dry day and whether the bid assumes dry ground, since that assumption belongs in writing.
Finally, keep your own copy of the visit notes. Write the date of the walk, the name of the person who walked the roof, how long the walk took, and which slopes were checked up close. If the bid changes later, those notes are the record of what was measured and when. They also give you a way to ask the next roofer the same questions in the same terms.
Ask us for the document, not for the ranking
A star rating separates the disasters from everyone else and then stops being useful. What separates the rest of the field is the written scope and who is actually standing on the roof, which is what the five criteria at the top of this page are built around.
Keys Roofing works in the same market as every other name on this page, and the fastest way to test our pick is to make us prove it on your own roof. Ask for the scope, lay it beside the two you already have, and hold all three against the same five questions.
Straight through to the Keys Roofing office. If you would rather talk it through than type it out, this is the line.
Ask for the third scope
Roof replacement. St. Louis metro only.
This goes to Keys Roofing and nowhere else. No other company named on this site receives it.