Ask Each Roofer How Many Jobs Sit Ahead of Yours on the Calendar

A roofer's open calendar sets your roof date, so ask how many jobs come before yours and whether any of them are only quoted.

A roofing bid tells you what the work costs and what it includes. It does not tell you when the crew will arrive. In a metro where one hailstorm can fill several calendars at once, the gap between a signed contract and a first nail can run from a week to most of a season. The question that closes that gap is simple: how many jobs sit ahead of yours, and in what order will they be done?

Roofer comparison

Two bids can show the same shingle, the same square count and the same start window on paper while the crews behind them work very different schedules. One roofer may have a single crew finishing a tear-off in Chesterfield with a second job queued for the following Monday. Another may have three crews across the county and no open dates until spring. The bid does not show either fact unless you ask for it.

Ask each roofer the same two things: how many signed jobs are scheduled ahead of yours, and how many days each of those jobs is expected to take. Write the answers down next to the start date in each proposal. A start date with no backlog attached is a guess dressed as a commitment, and the guess gets tested in late summer, when storm calls pile up and every calendar tightens at once.

Backlog matters most in two seasons. After a hailstorm, roofers across the metro get a surge of calls within days, and a company that accepts every lead can push your start date back by weeks without telling you. In the cooler months, a freezing day or a rain day can stop a crew for several days, and a full calendar means those lost days get stacked onto the next job rather than absorbed. A roofer with a short backlog has room to move your job forward when weather clears. A roofer with a long one may not.

Pay attention to what the roofer says about the jobs in front of you. Ask whether those jobs are already under contract or only quoted. A quote that has not been signed can disappear, and a company may still count it on the calendar. Ask whether any job ahead of yours is a repair that could turn into a full tear-off, since that kind of change adds days no one planned. A straight answer sounds like a list: the job count, the expected days, and whether anything is unsigned.

What it costs

A long backlog rarely shows up as a line item, but it has a price. If your roof stays open for a week while a crew finishes another job, you pay for that open week in exposure: a tarp that may not hold in a wind event, a ceiling that may take water, a lawn that gets torn up before the materials even arrive. Those costs fall on the homeowner, and they are not in the bid.

Ask what the roofer does with your deposit and materials while you wait. Some companies order shingles at signing and stage them on the lot. If the start slips, you may be paying for materials sitting in the driveway, and some suppliers charge for returns or restocking. Ask whether there is a restocking charge if the date moves, and whether the roofer will reschedule at no cost if a weather event pushes other jobs back. The answers belong in writing, not in a phone call.

Ask also whether a delay changes the price. Material costs in a bid are usually fixed at signing, but labor rates, permit fees and fuel or delivery charges can shift. If the calendar pushes your job into a later season, ask whether the roofer will hold the quoted numbers or re-price the work. Two bids that look equal on the first day can drift apart after a month of slipped dates.

Finally, ask what a cancellation costs. If you have to move your roof date because of a family matter or a closing on another property, the roofer may already have committed a crew, and the terms for that should be clear before you sign. Keys Roofing can be reached at (314) 220-2333 to talk through how dates, deposits and rescheduling work for a specific job.

What to ask

Use the questions below as a checklist for each roofer you are comparing. Keep the answers in the same column so the differences are easy to see.

  1. How many signed jobs are scheduled ahead of mine, and how many crew days does each one take?
  2. Are any of those jobs quoted but not signed, and do you still count them on the calendar?
  3. If weather stops work for several days, which job moves first, and how are my dates reset?
  4. When do my Atlas or Malarkey shingles ship, and where will they wait until the crew is ready?
  5. What happens to my deposit and materials if my start date slips by two weeks or more?
  6. Will the price hold if my start moves into a later month?
  7. What is the cancellation or rescheduling term for my signed contract, and where is it written?

Listen for specifics. A roofer who gives you a job count, a crew size and a plain account of what happens when weather hits is giving you a schedule you can check. A roofer who says the calendar is always open, or who waves off the question, has not given you anything to compare.

Missouri does not license roofers at the state level, so the calendar is one of the few places a homeowner can measure a company's capacity before the work starts. A written backlog answer is not a guarantee, but it gives you a baseline. If the start date later moves, you can point back to what was said and ask why.

Bring the answers to a second visit or send them as one written list. Compare the replies side by side with the proposal in front of you. The roofer whose calendar matches the date in the contract is the one whose start date you can plan a yard, a car and a week of work around.

From the company at number one

Ask us for the document, not for the ranking

A star rating separates the disasters from everyone else and then stops being useful. What separates the rest of the field is the written scope and who is actually standing on the roof, which is what the five criteria at the top of this page are built around.

Keys Roofing works in the same market as every other name on this page, and the fastest way to test our pick is to make us prove it on your own roof. Ask for the scope, lay it beside the two you already have, and hold all three against the same five questions.

The office line

Straight through to the Keys Roofing office. If you would rather talk it through than type it out, this is the line.

(314) 220-2333

Ask for the third scope

Roof replacement. St. Louis metro only.

This goes to Keys Roofing and nowhere else. No other company named on this site receives it.